Explore our store for top-quality spare parts!

Warning: Trying to access array offset on false in /data01/virt90326/domeenid/www.champion-group.eu/htdocs/wp-content/plugins/elementor/includes/base/widget-base.php on line 223

Warning: Undefined array key -1 in /data01/virt90326/domeenid/www.champion-group.eu/htdocs/wp-content/plugins/elementor/includes/base/controls-stack.php on line 695
Explore our store for top-quality spare parts!

Installation

Expert Hangar Door Installation

From aircraft hangars to industrial facilities – we deliver precision installation with guaranteed performance

Door Installation Excellence

At Champion Group, we deliver precision installation services backed by three decades of hangar door expertise. Our certified installation teams combine European engineering standards with proven field experience, ensuring flawless commissioning of your door systems across aviation, industrial, and maritime facilities worldwide.

What We Install

Aircraft Hangar Doors

Helicopter Hangar Doors

Industrial Warehouse Doors

Mining & Port Facility Doors

Key Benefits

Wind resistance

Up to extreme loads

Temperature resistance

For harsh climates

Dust & moisture protection

Protection systems

Sound insulation

Capabilities

Installation Options

Door Positioning

Within Door Opening

Standard installation

Inside Building Mount

Internal overlay installation

Outside Building Mount

External overlay installation

Specialized Building Mount

Tailored solutions for unique structures

Available Systems

NK2L & NK4L Models

Lifting gate systems

NK2 & NK4 Models

Partition solutions

Hydraulic Systems

Heavy-duty applications

Fabric Solutions

Flexible industrial doors

Installation Process

Step 1
Site Assessment
  • Technical survey and measurements
  • Environmental condition analysis
  • Custom solution design
Step 2
Planning & Preparation
  • Installation timeline: 1–10 working days
  • Detailed assembly instructions provided
  • Semi-ready products for efficient setup
Step 3
Professional Installation
  • Certified installation teams
  • Quality control at every stage
  • Performance testing & commissioning
Step 4
Handover & Support
  • Complete documentation package
  • Operation training provided
  • Ongoing maintenance support

Installation Options

Performance Standards

Heat Transfer Coefficient

$0.71 W/m²•K$ (insulated models)

Wind Load Resistance

Meets current European standards

Operating Temperature

Extreme climate capable

Security Features

Advanced protection systems

Installation Features

No guide rail at threshold

Easy passage for equipment

Easy floor covering replacement

Simple maintenance process

Modular sectional design

Simplifies installation and repair

Scalable for any opening size

Custom solutions for any project

Ready for Professional Installation?

Contact our technical team for a customized solution