





Door Group successfully delivered and installed a state-of-the-art Craneway Fabric Fold-Up Door for a leading energy storage facility in Kruonis, Lithuania. This project underscores our expertise in designing and implementing highly functional and durable door solutions tailored to the unique needs of the energy sector.
The NK2N model door, measuring 18500 x 10000mm, was specifically chosen for its robust construction and efficient fold-up mechanism, ensuring seamless operation in a demanding industrial environment. This installation highlights our ability to deliver customized solutions that combine advanced engineering with operational efficiency.
Door Group managed the entire project lifecycle, from initial consultation and design to on-time delivery and installation. Our team worked closely with the client to ensure the door system met all operational and safety standards, reflecting our commitment to quality and customer satisfaction.